Our square sandwich bubble gum production line integrates precise core injection, molding, and shaping. The finished product has a neat and clear shape, uniform weight, stable and efficient automated operation, both production capacity and quality.
The production line is composed of extruder, sugar bar conveyor belt,rope sizer,cooling conveyor belt and sandwich stamping machine, total five parts. It is an ideal production line for producing sandwich bubble gum,sandwich swiss candy,sandwich creamy candy and sandwich hard candy.It has the advantage of simple,convenient,stable and high productivity.

Technical parameters
|
External dimensions |
L13500*W1800*H1550 mm |
| Total power | 50KW, 380V, 50Hz |
| Production | 280~300kg/hour (basic on 3.5g/pc) |
| Total weight | 7000KG |
Why Choose ZHONGHONG MACHINERY Square Shape Sandwich Production Line?
Specialized Square Forming Machine
Equipped with a specialized square sauce shaping machine, ensuring clear edges and distinct corners of the blocks, make standard shapes.
Accurate Sandwich Injection System
By using a precise sandwich pump, jam, syrup and other fillings are quantitatively and stably injected into the center of the candy bar while the sugar paste is extruded.
Fully Automated
After coming out of the blender, the sugar paste is extruded, cooled, shaped, and polished in one smooth way, without the manual intervention.
Efficient And Stable Production
Mainstream equipment has strong production capacity, with a capacity up to 300kg/h.
Production line composition


Application & Final Products
Production line Video
FAQ
1. Q:How many workers need for this production line?
A:Normally it needs 18~20 workers, but it depends on your production plan
2. Q:How many square meters room for this production line?
A:Please send us the workshop drawings, we can give you advice
3. Q:What kind of products can this production line make?
A:Bubble gums and chewing gums
4. Q:Can I just buy one of the machine from this production line?
A:Yes,you can buy any single machine
5. Q:Can you send technician to commission the production line?
A:Yes,we have experienced technicians to commission the machines and teach your worker to operate the machines.
6. Q:What is the lead time for this production line?
A:About 90 days. and we will make good package for our machines
Leave A Message
Scan to Wechat/Whatsapp :